close

FF 830

FF 830 is a dust reduced, quick-drying finishing underlayment designed for skim-coating, smoothing and leveling prior to the application of floor coverings.

The FF 830 is suited for new construction and renovations. The product is intended for indoor use on substrates of concrete, lightweight concrete, ceramic tiles, gypsum boards, wood and homgenous PVC. FF 830 is easy to use and yields a very smooth surface finish.

Senden Sie alle Dateien

Alle Dateien herunterladen

info

Produktspezifikation

Technische Daten
add_circle
remove_circle

Die Freisetzung von Substanzen corrsive

CT (as per EN 13813)

Druckfestigkeitsklasse

C25 (as per EN 13813)

Biegezugfestigkeit Klasse

F6 (as per EN 13813)

Feuerwiderstandsklasse

A1 (as per EN 13813)

Die Haftung an der Oberfläche

> 2 MPa (as per EN 13813)

Dicke 1

0–12 mm

Stärke 2

6–12 mm lightweight concrete

Körnung

< 70 µm

Materialverbrauch

1.2 kg/m²/mm

Gewicht (trocken)

1200 kg/m³

Wasserbedarf

1,8 l/4,5 kg

Betriebstemperatur

10–25 °C

Mischzeit

2+1 min

Arbeitszeit

15–20 min

Abbindezeit

30–60 min

Abdeckbar (Fliesen)

1 hr

Carpetable

1–3 hrs

pH-Wert

approx. 11

Wasserschaden resistent

Yes

Oberflächen Zu, 28 Tage (poliert, geladene Oberfläche)

> 1,5 MPa

Schwindung

0,03–0,05 %

TVOC 28 Tage

< 10 μg/(m² h)

Verpackung
add_circle
remove_circle

83007

4,5 kg

info

Benutzen

Vorbehandlung
add_circle
remove_circle

The substrate shoul be clean and free of dust, cement skin, grease or other impurities that can prevent adhesion. Adhesion and surface resistance of the substrate should be no less than 0.5 MPa. Weak and porous substrates should always be primed with PP 600 and allowed to dry before applying FF 830. In terms of the primer forming a film, the temperature of the substrate must not fall below 10 °C. For best results, the ambient temperature in the work area should be between 10 and 25 °C. At higher or lower temperatures, the time for curing will shorten or extend. With the risk for cracks due to shrinkage or settings in the subfloor, a concrete surface should not be leveled within the first 28 days after casting. As a recommendation the RH in the concrete should have reached RH 95 % as the upper limit for applying the FF 830.

Vermischung
add_circle
remove_circle

Mix the dry powder with max 1,8 liter water ( max 40 % ) per 4,5 kg bag. Mix for 3 minutes with a drilling machine and a whisk to obtain a lump free mix. Product may be refreshed by re-mixing but do not ad more water.

Anwendung
add_circle
remove_circle

Apply the FF 830 to substrate with a steel trowel. After initial set, apx 10–15 min., remove any overlap marks, seams and inconsistencies by scraping with the steel trowel.

Nachbehandlung und Härten
add_circle
remove_circle

Protect FF 830 from excessive heat or draft conditions during the curing process. Protect for up to 24 hours after completed installation. FF 830 can be walked on after 30 minutes. Always make sure that the material is sufficiently dry before it will be covered by a carpet. The FF 830 may be covered by a carpet after 1–3 hours. The guiding value assumes a curing temperature of approximately 20 °C, 50 % RH and proper air flow. Newly produced surfaces must be protected against wind, sun and rain.

Verbrauchsrechner

FF 830

Verbrauchsrechner

phone

+46 171 46 65 90

Kontaktieren Sie unsere Auftragsabteilung

Kontaktiere uns

  • Verkstadsvägen 6
  • 746 40 Bålsta, Schweden
  • Tel. +46 171 46 65 90
  • E-mail: [email protected]

Combimix

Combimix entwickelt und produziert Mineral-basierte Produkte für die Bauindustrie. Unsere Produktpalette umfasst Produkte für den Bodenausgleich, Fassadenputz, Rendering, Beton-Resurfacing und Restaurierungsmörtel für Kulturbauten. Wir führen Vertrieb in Schweden, Dänemark, Norwegen und den Vereinigten Staaten.

Produktkategorien