close

Concrete Filler

Concrete Filler is used for smoothing and for repairs of smaller holes in a concrete base.

The filler is used for example, on stairs, garage floors, natural stone and mineral substrates. The product can be used both indoors and outdoors, as well as on horizontal and vertical surfaces.

Send all files

Download all files

info

Product specification

Technical data
add_circle
remove_circle

Compressive strength class

C28/35

Water-cement

0,4

Frost resistance

Good

Binder

Portland cement

Thickness

0–10 mm, in holes up to 50 mm

Grain size

< 0,25 mm

Air content

4–6 %

Water requirements

approx 0,8 liters/4,5 kg

Material consumption

approx. 2,0 kg/m²/mm

Workplace temperature

10–25 °C

Mixing time

3–4 min

Operating time 20 ° C

45–60 min

Begins to cure

approx. 60 min

Post-watering

72 hrs

Color

Grey

info

Use

Pre-treatment
add_circle
remove_circle

For best result, the temperature in the work area should be between 10–25 °C. Store the dry mortar and other materials so that they will remain over 10 °C before use. At temperatures lower than 5 °C, the strength development will cease. If the product is used in temperatures below 5 °C, then winter measures should be implemented. The substrate should be clean and free from dust, cement skin, grease or other impurities that can prevent adhesion. Smooth or glossy surfaces may need to be primed for maximum adhesion. Dry and highly absorbent substrates may be pre-watered.

Mixing
add_circle
remove_circle

The dry powder is mixed with approx. 0.8 litres of water (15-20%) per 4.5 kg bag. The mixing is done with a drill and a whisk for approx. 3–4 minutes. The filler is mixed into a homogeneous mass.

Application
add_circle
remove_circle

The filler is applied with a trowel or a putty knife. Work the filler thoroughly into the surfaces to be repaired. The surface can then be filled or brushed to create the desired structure. The repair can be edge cut with a trowel or a knife after approx. 1 hour. Filler which has begun to cure may not be mixed with more water and must be discarded.

Post-treatment and curing
add_circle
remove_circle

Protect newly-cast surfaces from direct sunshine, rain and high wind. The strength will increase with post-watering of the cured material. Post-watering should always be done for at least three days in dry and warm weather, as well as in the case of strong winds. Use a water hose with a fine spray nozzle. Then cover the post-watered surface with plastic.

Consumption calculator

Concrete Filler

Consumption calculator

phone

+46 171 46 65 90

Call our order department

Contact us

  • Verkstadsvägen 6
  • 746 40 Bålsta, Sweden
  • Tel. +46 171 46 65 90
  • E-mail: [email protected]

Combimix

Combimix develops and manufactures mineral-based products for the construction industry. Our product range includes products for floor levelling, façade plastering, rendering, concrete resurfacing and restoration mortar for cultural buildings. We conduct sales in Europe and USA.

Product categories